Professional Solutions
4Blue Connection System
Less repeated wiring. Faster repeat connections. A cleaner installation workflow.
The 4Blue connection system combines a 3-pole T-connector with a 2 m interconnection cable, included with the Lineva U19 Standard ON/OFF panel. After the first feed point, each next Standard ON/OFF panel can be connected in around 30 seconds in a clean daisy-chain run, subject to site conditions.

Connection system
What ships with every Standard ON/OFF panel, and what it changes on site
ScopeLineva U19 Standard ON/OFF only. After the first feed point, in a clean daisy-chain run, subject to site conditions.
BasisLineva U19 Standard ON/OFF: 3-pole mains distribution with integrated T-connector and 2 m male/female interconnection cable.
Basis20-Panel Daisy-Chain Example, 28 Aug 2026. Not a permitted maximum — circuit design remains qualified electrical work.
Scope. Connection-system details shown on this page apply to the Lineva U19 Standard ON/OFF version. DALI connection requirements are specified separately.
Scope of supply
What is included
One 3-pole T-connector and one 2 m interconnection cable are supplied with each Lineva U19 Standard ON/OFF panel.
In the Standard ON/OFF version, the system distributes L, N and PE along the daisy-chain run while one dedicated branch supplies each panel.

4Blue 3-pole T-connector

2 m interconnection cable

Lineva U19 Standard ON/OFF panel
Sequence
How the system works
- Establish the initial feed point The qualified electrician connects the first supply point according to the project design and applicable installation requirements.
- Connect the next Lineva U19 Standard ON/OFF panel The 3-pole T-connector continues the L, N and PE feed while one dedicated branch supplies the panel.
- Continue the daisy-chain run Each following Lineva U19 Standard ON/OFF panel connects through the included interconnection system, so there are fewer manual terminations to make.
20-panel daisy-chain example (Standard ON/OFF)

Safety. Connect or disconnect only when the circuit is isolated. Final circuit design, cable sizing and protection must be verified by a qualified electrician in accordance with local regulations.
Standard ON/OFF mains-distribution example, not a DALI control topology. Official 4Blue-LED artwork, also available as a PDF on the Downloads page.
Demonstration
The 30-Second Challenge
After the first feed point, each next Lineva U19 Standard ON/OFF panel can be connected in around 30 seconds in a clean daisy-chain run, subject to site conditions.
The challenge is demonstrated with the real 4Blue T-connector and 2 m interconnection cable so installers can evaluate the workflow directly.
Outcome
Practical installation advantages
- Fewer manual terminations across a row of Lineva U19 Standard ON/OFF panels.
- Creates a cleaner and more predictable repeat installation workflow.
- Includes the connector and 2 m cable with each Lineva U19 Standard ON/OFF panel.
- Helps reduce incomplete accessory orders and unnecessary return visits.
Responsibility
Important installation notes
- Installation must be carried out with the circuit isolated.
- Use only matching components of the 4Blue connection system.
- Final circuit design, protective-device selection, cable sizing, voltage drop and commissioning remain the responsibility of the qualified electrician or project designer.
- The statement that each next panel connects in around 30 seconds applies to the Lineva U19 Standard ON/OFF version, after the first feed point, in a clean daisy-chain run and subject to site conditions.
Next step
See the system in practice
Request a practical demonstration of the 4Blue connection system and Lineva U19 installation workflow.