Professional Solutions

4Blue Connection System

Less repeated wiring. Faster repeat connections. A cleaner installation workflow.

The 4Blue connection system combines a 3-pole T-connector with a 2 m interconnection cable, included with the Lineva U19 Standard ON/OFF panel. After the first feed point, each next Standard ON/OFF panel can be connected in around 30 seconds in a clean daisy-chain run, subject to site conditions.

4Blue 3-pole T-connector, black moulded housing with the 4Blue LED marking

Connection system

What ships with every Standard ON/OFF panel, and what it changes on site

~30 sto connect each next Standard ON/OFF panel

ScopeLineva U19 Standard ON/OFF only. After the first feed point, in a clean daisy-chain run, subject to site conditions.

1 + 1T-connector and 2 m interconnection cable with every Standard ON/OFF panel

BasisLineva U19 Standard ON/OFF: 3-pole mains distribution with integrated T-connector and 2 m male/female interconnection cable.

20panels in the published wiring example

Basis20-Panel Daisy-Chain Example, 28 Aug 2026. Not a permitted maximum — circuit design remains qualified electrical work.

Scope. Connection-system details shown on this page apply to the Lineva U19 Standard ON/OFF version. DALI connection requirements are specified separately.

Scope of supply

What is included

One 3-pole T-connector and one 2 m interconnection cable are supplied with each Lineva U19 Standard ON/OFF panel.

In the Standard ON/OFF version, the system distributes L, N and PE along the daisy-chain run while one dedicated branch supplies each panel.

4Blue 3-pole T-connector, black moulded housing with the 4Blue LED marking

4Blue 3-pole T-connector

4Blue 2 m male/female interconnection cable

2 m interconnection cable

4Blue Lineva U19 LED panel, three-quarter view of the light-emitting face and white frame

Lineva U19 Standard ON/OFF panel

Sequence

How the system works

  1. Establish the initial feed point The qualified electrician connects the first supply point according to the project design and applicable installation requirements.
  2. Connect the next Lineva U19 Standard ON/OFF panel The 3-pole T-connector continues the L, N and PE feed while one dedicated branch supplies the panel.
  3. Continue the daisy-chain run Each following Lineva U19 Standard ON/OFF panel connects through the included interconnection system, so there are fewer manual terminations to make.

20-panel daisy-chain example (Standard ON/OFF)

20-panel daisy-chain installation schematic

Safety. Connect or disconnect only when the circuit is isolated. Final circuit design, cable sizing and protection must be verified by a qualified electrician in accordance with local regulations.

Standard ON/OFF mains-distribution example, not a DALI control topology. Official 4Blue-LED artwork, also available as a PDF on the Downloads page.

Demonstration

The 30-Second Challenge

After the first feed point, each next Lineva U19 Standard ON/OFF panel can be connected in around 30 seconds in a clean daisy-chain run, subject to site conditions.

The challenge is demonstrated with the real 4Blue T-connector and 2 m interconnection cable so installers can evaluate the workflow directly.

Outcome

Practical installation advantages

  • Fewer manual terminations across a row of Lineva U19 Standard ON/OFF panels.
  • Creates a cleaner and more predictable repeat installation workflow.
  • Includes the connector and 2 m cable with each Lineva U19 Standard ON/OFF panel.
  • Helps reduce incomplete accessory orders and unnecessary return visits.

Responsibility

Important installation notes

  • Installation must be carried out with the circuit isolated.
  • Use only matching components of the 4Blue connection system.
  • Final circuit design, protective-device selection, cable sizing, voltage drop and commissioning remain the responsibility of the qualified electrician or project designer.
  • The statement that each next panel connects in around 30 seconds applies to the Lineva U19 Standard ON/OFF version, after the first feed point, in a clean daisy-chain run and subject to site conditions.

Next step

See the system in practice

Request a practical demonstration of the 4Blue connection system and Lineva U19 installation workflow.

Request a demonstration