Documentation
Technical downloads
Access current 4Blue-LED product information, technical documentation and project-support files.
Documents on this page are revision-controlled. Further photometric, UGR, warranty and compliance documents will be added as they are finalized and approved.
Four core documents
Current product documents
- Download
DOC 01
4Blue Lineva U19 — datasheet
- Download
DOC 02
Philips Xitanium UHE — Standard driver EN
- Download
DOC 03
Philips Xitanium Mini DALI DS — DALI driver EN
- Download
DOC 04
Quick Installation Guide
Eight illustrated steps, the safety instructions and the installation-responsibility statement. Installation, testing and commissioning must be carried out by a qualified electrician with the circuit isolated.
Note. Driver approval marks apply to the Philips driver, not automatically to the complete Lineva U19 luminaire.
Supplementary
Project support
Further documents that show where the published figures come from and how the system is installed. They are not part of the four core product documents above.
- Download
PS 01
Energy Savings Example
Basis for 42.1% lower connected load (22 W Lineva U19 vs 38 W legacy panel), 7,008 kWh/year saved and €1,332 saved per year: 100 panels · 12 h/day · 365 days · illustrative assumed electricity rate €0.19/kWh (Czechia). At an illustrative assumed rate of €0.20/kWh (Slovakia): €1,402/year. Illustrative connected-load example only. Actual savings depend on operating hours, tariffs, controls, project design and the final application. The electricity rates used are illustrative assumed model inputs, not current national tariffs and not a price offer. This is not proof of equivalent delivered illumination.
- Download
PS 02
20-Panel Daisy-Chain Example
Official schematic for a clean daisy-chain run. The published 3-pole schematic applies to the Lineva U19 Standard ON/OFF version. DALI connection requirements are specified separately. Connect or disconnect only when the circuit is isolated. Final circuit design, cable sizing and protection must be verified by a qualified electrician in accordance with local regulations.
In preparation
Additional technical documentation
Photometric files (LDT, IES, DIALux), UGR tables, warranty terms and approved compliance documents will be added here as they are finalized and released.
Next step
Need a specific technical file?
Contact 4Blue-LED with your project requirements and the document or technical information you need.